Versioned modules, one environment

Every module runs last, current and next.

No staging. Each part of your product ships on its own version, tests next with real users behind a flag, and steps back to last on its own when something breaks. AI agents write, review and patch along the way.

Free for one project. Sign in with your Lucasia account.

The full process, module by module

Three modules of one product, each on its own version. Watch a change go from an agent's first draft to everyone, and watch a failure roll itself back.

  1. ChangeAn agent or a person changes the billing module.
  2. Test what changedTests run for billing and for search, which uses it.
  3. AI reviewA second model reviews the change before it ships.
  4. Next, behind a flagv2.5.0 goes live for 10% of users, then more.
  5. PromoteNext becomes current, current becomes last.
  6. WatchHealth checks run on every current version.
  7. Fail backSign-in v1.8.0 fails, so last takes over on its own.
  8. PatchThe fix ships as v1.8.1 in next.
Module
LastCurrentNext
Billingpayments
Sign-inaccounts
Searchuses billing

Three modules, three versions each.

What Versimo does

Three versions per module

Last, current and next, always. Rollback is a switch, not a rebuild.

Flags built in

Next reaches a share of users you choose, then everyone. One standard flag API for every app.

Automatic rollback

A failing health check sends traffic back to last and opens a patch ticket.

Test only what changed

Each change runs the tests for its module and everything that uses it. A full run happens nightly.

AI native

Agents propose changes, a second model reviews them, and patches are drafted for you to approve.

One place to see it

Every module, version, flag and rollback on one screen, with a full history.

Known parts, put together

Versimo is not a new invention. It is our way of combining practices large teams already trust, and running all of them per module instead of per product.

  • Release channelsStable, beta and nightly, as browsers have shipped for years.
  • Blue-green deploymentTwo live versions side by side, so going back is a switch.
  • Canary and progressive deliveryA new version reaches a few users first, behind a flag, then everyone.
  • Semantic versioningEvery module carries its own version, and fixes ship as patches.

Simple pricing

Start free. Prices are per month, excluding VAT. Paid plans open soon.

Free

£0

  • 1 project, up to 5 modules
  • Last, current and next
  • Flags and automatic rollback
  • 7 days of history
  • Community support
Start free
Most teams

Pro

£29 per project

  • Unlimited modules
  • AI review on every change
  • AI drafted patches
  • 90 days of history
  • Email support
Join the waiting list

Team

£149 up to 10 projects

  • Everything in Pro
  • Single sign-on and roles
  • Audit log
  • 1 year of history
  • Priority support
Join the waiting list

Questions

Do I still need staging?
No. Next runs in the same environment as current, behind a flag. That is your user test.
What happens when current fails?
Traffic goes back to last on its own. The fix ships as a semver patch, for example 2.4.0 to 2.4.1.
Which sign-in does it use?
Your Lucasia account, one login across every Lucasia app.
Is there a community?
Write-ups, examples and a place to compare notes are coming soon.